IS

White, Kathy Brittain

Topic Weight Topic Terms
0.201 cognitive style research rules styles human individual personality indicates stopping users composition analysis linguistic contextual
0.160 methods information systems approach using method requirements used use developed effective develop determining research determine
0.153 project projects development management isd results process team developed managers teams software stakeholders successful complex
0.143 mis management article resources sciences developing organization future recommendations procedures informing organizational assessment professional groups
0.139 satisfaction information systems study characteristics data results using user related field survey empirical quality hypotheses

Focal Researcher     Coauthors of Focal Researcher (1st degree)     Coauthors of Coauthors (2nd degree)

Note: click on a node to go to a researcher's profile page. Drag a node to reallocate. Number on the edge is the number of co-authorships.

human resource management 1 MIS systems design 1 MIS systems development 1 Project teams 1

Articles (1)

MIS Project Teams: An Investigation of Cognitive Style Implications. (MIS Quarterly, 1984)
Authors: Abstract:
    A profusion of technology is insufficient to implement effective computer systems without the full utilization of human resources to develop such systems. The issue of fully developing and utilizing available human resources is currently receiving careful scrutiny in the MIS literature. One methodology for fully utilizing human resources has been maximizing productivity by stressing team effort. This research focuses on evaluating the systems development activities of two MIS project teams. Empirical evidence was gathered from interviews with MIS personnel and key users concerning strengths/ weaknesses of the two project teams. Analysis was performed to determine the personality characteristics (as measured by the Myers-Briggs Type Indicator) of the MIS staff. The results of this analysis indicated a void of certain personality styles in project team one. This void correlated with weaknesses ascertained from the interview data for project team one. Project team two, with all four personality styles represented, was evaluated as very successful. Recommendations are made for assembling project teams based on these findings.